construction

steam generator design & fabrication

project overview

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip .

Dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum. Sed ut perspiciatis unde omnis iste natus error sit voluptatem ac cusantium doloremque laudantium, totam rem ap eriam, eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae vitae dicta sunt explicabo.

25.07
2016
COMPLETION
55%
Steam Generator Design & Cation

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt.

read more
COMPLETION
55%
Construction Design & Fabri

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt.

read more
Construction

Lorem ipsum dolor sit amet, consectetur adipisicing.

read more
Construction

Sed do eiusmod tempor incididunt ut, dolor sit amet.

read more
Construction

Consectetur adipisicing elit, sed do eiusmod tempor.

read more

Exclusive Features of our New Proposal

  • Very near Kendriya Vidyalaya ,Sankara vidyalaya & ZION Matriculation school
  • Near to Ancient Siva Temple & 18 Siddha Temple
  • Near Bharath Engg College
  • 1 km Velacherry - Tambaram Main Road
  • 5 km from Tambaram Railway Station
  • 11 km from International Airport

FLOORING

  • Flooring in Living, Dinning and Bedrooms will be of   2' x 2' vertified.
    Tiles (budget Rs.45/- To Rs.50/-per sq.ft)
  • Toilet floor area will be of first quality anti skid tiles.
    (budget Rs.35 to Rs.40/- per sq.ft)
  • Toilet will have first quality wall tiles for up to sealing level.
    (budget Rs.35 to Rs.40/-persq.ft)

DOORS & WINDOWS

  • Main door Frame made of Teak wood
  • Other door Frame made of teak  wood with first quality flush door
  • Windows frame and Shutters made of  teak wood

PAINTING FINISHES

  • All Interior walls putty finished with emulsion paint
  • External walls will be finished with exterior emulsion
  • Doors/Windows/Grills will be finished with enamel paint
  • Ceiling will be finished ultra white paint

KITCHEN

  • Kitchen with Granite top and wall tiles for 3.5 ft above the plaform

ELECTRICAL

  • Three Phase Supply
  • AC Point in all bed rooms
  • TV & Telephone point in living and bed room

PLUMBING & SANITARY

  • High quality chromium plated fitting will be provided in toilets
  • Attached toilet will be provided european water closet & 1 washbasin
  • Common toilet will be provided Indian water closet& 1 washbasin
Flat No Floor Type Buildup Area Availability
F3 First 2BHK 801 Available
F4 First 2BHK 801 Available
S3 Second 2BHK 801 Available
S4 Second 2BHK 801 Available
Flat No Buildup Area UDS Area Rate Per SQ.FT EB Car Parking Service Tax Total Cost FLOOR AND FACING Availability
F3 801 420 4300 25,000.00 1,50,000.00 1,08,000.00 36,19,000.00 FIRST/NORTH AVAILABLE
F4 801 420 4300 25,000.00 1,50,000.00 1,08,000.00 36,19,000.00 FIRST/SOUTH AVAILABLE
S3 801 420 4300 25,000.00 1,50,000.00 1,08,000.00 36,19,000.00 SECOND/NORTH AVAILABLE
S4 801 420 4300 25,000.00 1,50,000.00 1,08,000.00 36,19,000.00 SECOND/SOUTH AVAILABLE
EXCLUDING SERVICE TAX AND REGISTRATION